Dampier Wet Salt Dump Bridge

Project Type

Structural Engineering

Project Location

Dampier, WA

Project Duration

9 Months

As part of their continuous maintenance plan, Dampier Salt Ltd had planned to replace the existing wet salt dump bridge approach slabs and main steel deck to improve current operations in the Dampier site. The design of the replacement bridge deck and approach slabs for the wet salt dump bridge required fitting into the main existing structure which was still in adequate condition not requiring to be replaced.