Swan River Pedestrian Bridge – Temporary Works

Project Type

Structural Engineering

Project Location

Perth

Project Duration

12 Months

The Swan River pedestrian bridge will connect people moving between East Perth, Burswood Peninsula and Perth Stadium. McDowall Affleck have been appointed by DEAL-Enigma to design the Approach Ramps package. McDowall Affleck have been engaged to complete Temporary Works engineering for the project.