Roy Hill Railway Signalling Systems

Project Type

Structural Engineering

Project Location

Regional WA

Project Duration

12 Months

Our client Ansaldo were engaged as a D&C contract for the signalling infrastructure along the 344km railway from the mine to Port Hedland. McDowall Affleck were engaged to certify various signalling structures located along the rail line. The structures included signs, boom masts, sun shelters and solar panel frames. We also provided support during the construction support when it was discovered that the site soil conditions differed from what was anticipated during the design phase.