Cape Cuvier Jetty Deck Replacement

Project Type

Structural Engineering

Project Location

Regional WA

Project Duration

12 Months

McDowall Affleck was initially appointed to provide the tender design, and subsequently to undertake the detailed design of the Fibre Reinforced polymer Planks, plan the testing campaign and liaise with University of Western Australia, attend the testing and report on the results. McDowall Affleck performed a non-linear Finite Element Analysis of the individual planks and the assembled panels, made of non-isotropic material and submitted the results to the principal and the principal’s engineer for review and approval.