McDowall Affleck’s Structural Team have carried out a number of projects within the airport precinct. These include design and documentation of Smoker Shelters at the Domestic terminal, provision of assistance to the builder (Built Environs) with coordination, secondary framing and temporary systems design at the International Terminal Expansion, verification of Bus and Taxi Canopies Design at the Terminal T2, design of BIDS screen and modification of the screen walls at the canopies.
To complete these projects, the team had to be well aware of the stringent design as well as OS&H requirements of the airport and became very familiar with the systems and protocols of the Airport Corporation. This, along with their knowledge of constructibility and a can-do attitude, provided the airport with efficient and effective solutions.