Eliwana Bridge – Temporary Works

Project Type

Structural Engineering

Project Location

Tom Price, WA

Project Duration

10 Months

McDowall Affleck assisted the NRW Contracting site team during the construction stage of the Eliwana Project Bridges. McDowall Affleck was requested to provide design and third party verification of temporary works including lifting beams, void formers, A-truck frame, prefabricated reinforcement lifting and propping, formwork propping and foundations, temporary restraint system for steel decks during installation.